The Operation Specification of Vibration Platform

Using Introduction:
1. Before installing the vibration platform, please lay a good foundation, then install it, when installation, the fixed bolts must be tightened.
2. Before test run the well-installed vibration table, first 3-5 minutes start-up to check all the fastening bolts, if loose, should be tightened.
3. In the process, concrete products should be firmly fixed on the vibration table, and be symmetrical with the platform to balance the load. Users can design their own vibrated product fastening device according to their needs.
4. Vibrator bearings should be inspected and cleaned regularly and maintain a good lubrication of the bearing to prolong the service life of the vibrator.
5. Vibration table should be reliable grounded to ensure safety.
vibration platform
vibrating platform
Operating Regulations:
1. Before using the vibration platform, 3 ~ 5 min non-load test first, then stop and tighten all fastening parts, 2 ~ 3 times repeatedly, it can be put into operation.
2. When using vibration table, the test mode of concrete specimens must be securely fixed on the working platform. In order to balance the load, test mode must be placed symmetrically with the center line of the table.。
3. Vibration motor should be grounded well and reliably.
4. In the production process, if vibration table sound is abnormal, please stop using immediately, unplug the power and fully inspect whether the fasteners are loose or not, check whether the inner eccentric vibration block of motor is loose or damaged, if necessary, tighten the loose parts and replace the damaged parts.
vibration motor
vibrating motor

5. After using, please turn off the power, clean the vibration table surface.